This project involves the Survey, Investigation, Design, Supply, Installation, Testing, and Commissioning of a comprehensive Lift Irrigation and Water Distribution System under the Upper Bhadra Project. The scope covers end-to-end execution of critical head works, power infrastructure, transmission systems, and large-scale water distribution networks, ensuring reliable water supply to multiple tanks across Pavagada and Challakere Taluks.

The project is designed to strengthen irrigation infrastructure, enhance water availability, and support sustainable agricultural development in the region.

01

Head Works & Lift System

  • Improved water storage and reduced seepage losses
  • Strengthened last-mile irrigation infrastructure
  • Enhanced water availability for agricultural lands
  • Increased efficiency and lifespan of farm ponds and pipelines

02

Power Supply & Electrical Infrastructure

  • Power supply systems including Terminal Bays
  • Construction and commissioning of Substations
  • 33 KV Transmission Lines for uninterrupted power supply

03

Water Conveyance & Distribution

  • Construction of Rising Main Pipelines
  • Pressure Distribution System for efficient water flow
  • Gravity Distribution System covering command areas

04

Operation & Maintenance

  • System reliability and performance
  • Preventive and corrective maintenance
  • Long-term operational efficiency